Skip to Content
avatar image
Former Member

Background MRP

Hi, PP Expert

Can u tell me why we use Background MRP.

And plz tell me settings for that,what is variant for that.

Thanks...

Nitu...

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 04, 2008 at 09:36 AM

    Hello Nitu,

    Backround MRP we use because it is needed that MRP should run when the system is idle because it require lot of processing.

    system is generally idle at night time so we genrally prefer to shedule it in backround in night timing by using MDBT.

    Hope this will clear you

    Regards

    AM

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 04, 2008 at 09:34 AM

    Hi,

    Background MRP run is done in case if you want it on a time basis say for example: Materilas to be planned by 10 pm on daily basis. The T-code used for Backgroung run is MDBT

    Check up the foll. link for background MRP run procedure:

    [MDBT - MRP run|mrp-background-run]

    Hope this helps..

    -Thaila Shree

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 04, 2008 at 09:40 AM

    Hi,

    The total planning run is usually carried out as a background job with a variant for the plant to be planned. If you have a large number of plants that are mutually dependent, for example, due to stock transfers, this procedure can be quite time-consuming as you have to plan some of the plants several times. So we use background MRP run.Background job is recommend to run MRP..

    Please refer this link,

    [Background MRP|http://www.sap-img.com/pp019.htm]

    Regards,

    R.Brahmankar

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 04, 2008 at 10:33 AM

    Hi,

    Use transaction MDBT to run MRP in background.

    Create a variant & schedule the MRP run.

    The program is RMMRP000.

    In transaction SM37 the status of the background job can be seen.

    Regards,

    Sankaran

    Add comment
    10|10000 characters needed characters exceeded