Dear SAPIENTS,
I created a material with UOM (M)just now and than assigned to inspection plan. Now I am changing the UOM of material to Nos.. I was getting following
Error: The base unit of measure cannot be changed
The reasons for this are
Routings already exist that are assigned to the material.
RType RtgGrp GpC Plant
Q QRW6MTQT 1 1100
SO I removed the material from inspection plan. But still I am getting the same error. Can anybody tell me the reason behind it?
Regards,
Kaushal Rai