Simulation version

Former Member
0 Kudos

Hi,

On simulation i have two questions

1. What is the significance of simulation profile. Is it required to be assigned for the project (Through project profile) before carrying out the simulation?

2.I am trying to create simulation version in CJV4 for the project. I have created the simulation profile and assigned it to my project profile. But when i try to create the simulation version i am getting the following error

"When you want to run a report that uses the PSJ logical database, module pools are generated for runtime optimization and memory optimization. This module pool cannot be generated since therew is an error in the logical database. This error can only occur, if the SAPDBPSJ program was changed during the runtime of your prrogram".

Can any body help me in this?

Rajesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Simulation profile is not mandatory. The profile controls what texts get copied from operative project to simulation. If you dont give this profile, all texts get copied into simulation.

I would be able to help if you tell me the error message number. I hope it is not dump. In that case goto ST22 and let me know the details.

Regards

Former Member
0 Kudos

Hi Shrikant,

The error message number is

Message no. OK033

Thanks for help

Former Member
0 Kudos

I could find 4 notes relevant to ur issue:

996188, 165309, 144419, 125199

I couldnt make out which would be most applicable to u. Suggest to go thru them and find out.

Regards