procedure for gate pass along with billing document?

Hi

any body know the procedure about "issueing gatepass along with billing document" ..?

anybody can suggest me ..regarding gatepass configuration procedure..?

thanks and regards

sesidhar

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    Sep 02, 2008 at 09:32 AM

    Hi

    Please check the Tcode LECI.

    Thanks,

    Ravi

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 02, 2008 at 07:00 AM

    Normally we use the excise invoice print to remove the material from the plant. Gatepass will be used in conjunction with the material document. During PGI material document will be created. You can take the print of this material document using the standard output available in SAP. If you want changes then it can be customized as per the requirement.

    Regards,

    GSL.

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 02, 2008 at 07:12 AM

    Dear sesidhar

    As rightly pointed out by GSL, gatepass will come into picture only in case you send an excisable material outside the factory say for example, to subcontractor which comes under the purview of MM. From SD side, excise invoice is sufficient.

    thanks

    G. Lakshmipathi

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Check with your MM consultant. From SD side there is no configuration.

      There is a feature to use a worklist to print the material documents.

      Regards,

      GSL.