rework

hi

plz suggest me for the rework order cycle in discrete manufacturing

thanks

surendra

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

2 Answers

  • Sep 02, 2008 at 05:24 AM

    Hi,

    1.Create Rework order without material at CO07 with out material .

    2. Assign the settlement receiver as orginal production order at settlement rule.

    3. Assign the rework material & component if needed at rework order & assign the issue storage location (unrest- use storage loaction above).

    4. Do the confirmation for rework order & rework materail will be issued from stock to order

    5. GR will not be done for rework order.To get stock for reworked material Do the GR for orginal order & settle the both order .

    standared SAP order type PP03 for rework

    Refer this therad also,

    https://forums.sdn.sap.com/click.jspa?searchID=15796915&messageID=5957598

    Regards,

    R.Brahmankar

    Edited by: R Brahmankar on Sep 2, 2008 10:55 AM

    Add comment
    10|10000 characters needed characters exceeded

    • Hi,

      The indicator Rework is set in the control key. An operation for rework in a routing cannot be scheduled because the rework quantity has not yet been determined.You can manually enter an operation quantity for these operations in the production order.

      Please check this thread also,

      Rework Order

      Regards,

      R.Brahmankar