cancel
Showing results for 
Search instead for 
Did you mean: 

File adapter scheduling

Former Member
0 Kudos

Hi All,

I want file adapter to pickup the file only on tuesday . Can i specify the interval as 604800(3600sec *24 * 7) for week i.e tue'day to tue'day if there is any daily it will pick on wen'day for that i am trying to specify retery interval also.could you pls help me this.

Pls suggest me how i can handle this

Thanks in advance,

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Venkat,

Please go tru this link.

U can shedule your communication channel using availability time option in RWB.

This option will be available from SP19 onwards.So,no need of BPM.

Thanks,

Kalyan.

Answers (10)

Answers (10)

Former Member
0 Kudos

Hi

Thanks for your information i am going through the Prateek point as Planning and Availability Times there i can see the we can create the role for our communication on weekly basis, but i have doubt pls if we specify the pole interval time as 604800(3600sec *24 * 7) in communication chennal itself it will not work?

Thanks,

Venkat.

Former Member
0 Kudos

Hi venkat,

By choosing Availability Time Planning, you can schedule the availability times for communication channels that you want to control automatically and not manually

Go to Component Monitoring->Adapter engine->Communication channel monitoring-> selct the CC->Availability Time Planning.

U can scedule their.

Regards,

Jayasimha jangam

Former Member
0 Kudos

Dear Venkat,

You can achieve this functionality using BPM. Hope below link will help you.

kkram
Contributor
0 Kudos

Hello

Apart from other answers provided, in one of my projects, we handled the scheduling using Redwood process scheduler (CPS is a part of netweaver stack now). The communication channels were started and stopped externally as described in the link below.

http://help.sap.com/saphelp_nw70/helpdata/EN/45/0c86aab4d14dece10000000a11466f/frameset.htm

KK

sunil_singh13
Active Contributor
0 Kudos

Hello Venketa,

You can achive your reqirment in three ways ,

1) Availability Time Planning as suggested by Prateek

2)using BPM

https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/d458a870-0601-0010-caab-b99...

https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/4f61fddf-0601-0010-7ab5-fb7...

3)Using Concept of Event Driven Message Processing

Thanks

Sunil Singh

Former Member
0 Kudos

Hi,

You can schedule the adapter by going to RWB> component monitoring>Adapter engine--> Communication channel monitoring... and then at the right corner you find Availability Time Planning link, where you can plan and schedule the adapter.

Regards,

Nithiyanandam

Former Member
0 Kudos

Hi Venkata,

In addition to the suggestions by Prateek and sanjeev,

check this blog by shabarish.. it will give u a detailed explanation on how to schedule the adapters....

As long as u have SP 19 and above...U can do it...

Hope this helps u out

Former Member
0 Kudos

Hi,

In the communication channel Found a tag automatically..

Right click the tag and schedule the communication channel daily based.

Select which need to Active the communication channel.

Regards,

prakasu

former_member194786
Active Contributor
0 Kudos

Hi Venkat,

You can use the Availability Time Planning option available in the RWB. It will be a better option for that.

<<<< By choosing Availability Time Planning, you can schedule the availability times for communication channels that you want to control automatically and not manually. >>>>

Go through this link for more details on it:

http://help.sap.com/saphelp_nw04/helpdata/en/44/2a1a8620323f0ee10000000a114a6b/frameset.htm

Regards,

Sanjeev.

prateek
Active Contributor
0 Kudos