Dear Sir,
We hava a following business scenario :
We made a PO and done the GR . Subsequently Inspection lot was also accpted and UD also done . The MIRO was also made . Subsequently Material was issued to a Production Order .
During the operation , it was found that Material has some problem and need to be rejected .
Kindly guide us as what steps need to be followed to send back the Material to Vendor .
Pl help us .
Rgds
B Mittal