on 08-30-2008 7:15 AM
Hi SRM Experts,
I am using SRM 5.0 classic scenario and backend system is ECC 6.0. I am trying to procure a material through "Internal Gods/Services" using SRM but i am getting the error message " Material does not exist for plant XXXX or flagged for deletion".
I have maintaiend plant in extended attributes and materail is also active in SAP ECC.
Can you please suggest on this
Thanks
Ravi
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ravi,
What is the material type of the material?
Rgds,
Aakash
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Guru's
Problem has been resolved. Solution from SAP.
ou need to create a new entry for the local system in the customization settings (spro-> Supplier Relationship management -> SRM Server ->
Technical Basic settings -> Define Backend systems). This entry is im-
portant for the conversion exit to convert the material numbers to the
correct format in the backend.
The entry should be maintained in customizing as follows:
Local system : <local logical system name>
Description :
RFC Destination: <local logical system name>
Sys. type : Local B2B system
RFC :
Local : X
FI Valid : real-time backend validation of FI data
The remaining fields can be left blank. Please make sure that the Local
check box is checked for the new entry.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.