Skip to Content
author's profile photo Former Member
Former Member

Employees in MSS

Good Morning,

Is there a Evaluation Path Objects standard that will allow me get the employee that is in a project in the module of PS in the iview of MSS.

I am check the configurations of OADP in the IMG, but i want know if Is there a Evaluation Path Objects standard or if definitely the solution is with the development of a Function Module.?

Regards,

Wilman

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 29, 2008 at 01:45 PM

    Hello Softtek,

    Evaluation Paths with Non-Specified Target Object Types

    Problem Description

    The use of evaluation paths with an unspecified target object type of a relationship is an additional cause of performance problems, even though the request on the authorization profile is limited to certain (target) object types, as the following example illustrates:

    Example

    Assume that the authorization profile should determine the permitted persons by organizational unit and position. You can use the SBESX evaluation path for this:

    Evaluation Path SBESX:

    O B002 O

    O B002 S

    S A008 *

    If you use this evaluation path, the objects linked with positions are not determined by the definition of the evaluation path but according to the T77E table (Permitted Relationships).

    As a result, all other objects that could be linked to a position (object types BP and US) are also imported to the set of objects. This is NOT necessary for the current requirement.

    Solution

    To avoid this, an evaluation path with a specified target object type should be used:

    The Z_SBESP evaluation path could be used for this example:

    O B002 O

    O B002 S

    S A008 P

    Thanks

    regards

    Vijai

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      I have the following question.

      What Implic have update the Relationship of the object OM en HR by a program ABAP when an employee is assign or dessign to a project different and with a Lider Project in the module of PS.

      I question this, because the employees in the company are changing very much of projects and the user of Human Resource no want do those change in the submodul of OM in HCM.

      I have two option:

      1- Do an program abap that update the relationship in the object getting the information of the Project lider in the module of Project System (PS).

      2. In the MSS in the configuration of the OADP, create a Module of function that read the Project Leader and get the employees that report a this Project Leader.

      The question is ¿Which is the best practice for doing this?

      Regards.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.