I have VS 2003 and both CR 9 and CR2008 installed on my pc. When I open up a project with VS 2003, I get the prompt asking if I want to convert the reports (originally cr9) to cr 2008. If I select the option to not convert, it still changes my references to the CR2008 libraries.
Anybody have any ideas on how to prevent this?
Thanks