on 08-26-2008 6:03 PM
Hi ,
Can any one help me in understanding the steps involved in configuration of Import Declaration in GTS. i have done configuration but GR document from feeder system shows got transfered but i m not able to view it in GTS, and no log also exist for the same.
Kind regards,
Sameer
Hello Sameer,
Where you able to figure out this issue? I did configure PO to trigger creation of CF 3461 (Immediate Release) in Import Scenario. I have having similar issue with GR to trigger CF 7501. Do let me know if you are still around can can reply to some of the issues that I have in GTS 7.2.
Thanks
Rohit Joshi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I'm looking for Rohit Joshi my colleague worked with him the past so if anyone knows how to get a hold of him please have him contact me at brian . lang at gravityproconsulting co m
I'm looking for a Consultant that will be solely responsible to set-up and configure both the Sanctioned Party List Screening and Embargo Checking Controls sub-modules of GTS 8.0.
This is a fairly straightforward planned implementation, and they are only taking advantage of some limited functionality initially with 8.0. With that said, we want a really Sr. Resource to complete this project and can't afford for it to get delayed by a less experienced resource. Having SAP GTS 8.0 experience is obviously good, but not completely necessary.
got the solution
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The process for Import declaration goes as follows:
1. Create purchase order
2. Create Inbound delivery
3. Update inbound delivery with MRN and T1 doc type ( Header - foreign Trade- Prelim doc ) for followig
field
PrevDocType T1 T1 transit document
Prelim. doc. no. MRN number
(This inbound delivery creates a custome document in GTS )
4. Post Goods receipt in R/3
5. Create Import declaration. in GTS
Configuration Required in GTS:
Transit Procedure
1. Define Regal regulation (Legal code 07)
2. Determination Procedure for Active Legal Regualtion ( Determination Strategy- LETRS - Cntry Level)
3. Activate Legal regulation for Destination county with combination of Departure country
4. Define Document type TRLOIM
5. Activate Document Type
6.Define Control Settings at Doc. Type Level and Legal Reg. Level ( If Access Control slected in previous step is Leg Reg/Doc) Action Profile,Partner Group,Text Det Proc.,Calc Profile.
7. Assign Document type at feeder system or feeder system group level. Application Level MM0B
8. Define Item Category
9. Assign Item Category at feeder system or feeder system group level. Application Level MM0B
10. Define Determination of Prev. Doc. Type from Feeder System at the receipt (T1- Tranist Proc.- MRN)
11. Define Determination of Target Procedure from Prev Doc type for Collection (LECTPR- Transit Proc- Duty Unpaid -Transit)
12.Assign Determination Procedure for Active Legal Reg LETRS
13. Activate Legal Regulation for Transit Procedure for Destination and Departure country combination
14.Control Settings for Transit Proc.
Configuration for Cusotms Procedure for Import Declaration
1.Define Regal regulation Legal code 01
2.Determination Procedure for Active Legal Regualtion ( Determination Strategy- LECUS- Cntry Level)
3.Activate Legal regulation for Destination county with combination of Departure country.
4. Define Document type CULOIM
5. Activate Document Type
6.Define Control Settings at Doc. Type Level and Legal Reg. Level ( If Access Control slected in previous step is Leg Reg/Doc) Action Profile,Partner Group,Text Det Proc.,Calc Profile.
7.Assign Document type at feeder system or feeder system group level. Application Level MM0C
8.Define Determination of Target Procedure from Prev Doc type for Collection LECCUS- Transit Proc- Duty Unpaid -Free Circulation
9.Default data can be configured as per reqmt.(Define Default Data fields, Partner, Messages, Emails .
Define Determination Procedure for Defaulting Data)
10.Customs Code list Can be configured as per reqmt. (Def Proc for Customs Code List,
Assgn CstCde lists to Leg Reg ,Maintain Cust Cde List for Leg Reg Assign Custom Status to a process ,and Leg Reg Assignn Declaraton type to a Process and Leg Reg)
11. Define Type Of Auth for Customs Processing (Detial of Auth type has to be maintained in GTS Main Menu Under Customs Mgmt- Customs Processing IMP/EXP --Operative Cockpit- Authorisation- Authorisation for Simple Proc)
12.Assign Det Proc for Active Legal Reg LECUS
13 .Activate Legal Reg for Customs Proc for Dest and Dep country combination
14.Control Settings for Cust Proc.
Configuration In Communication Process in Required for Both Transit and Customs services:
1. Define Tech Med for Msgs ( PPF) for Custom Shipment and Decalration ( If any messages required)
2.Define Condition and Output Parameters for Comm Of Cust ship & Decl.
3.Define Messages For Comm Process.
4. Define Control Settings of Communication Process
Process Templates, Process, Activities,Messages,Activity Seq,Subsequent Activity ,
( Required to configure both got Transit and customs services as both need a Process tamplates)
5.Determination Of Activity Sequence.
6.Classify Foreign Trade Document.( For messages)
7.Define Standard Text and Logo For Printing Document ( If reqd for mesages)
8.Print Control For Foreign Document .
Kind Regards,
Sameer
Hi Sameer,
Thanks for an elaborative explanation.
Have a question:
How can we differentiate Import Legal Regulation & Export Legal Regulation?
i.e., While Exports we use legal regulation as "EAR" and with some License types.
How do we do the same in Imports Process.
Could you please update me on this.
Thanks-in-Adv,
NRao
Regardig your Question
" Can any one help me in understanding the steps involved in configuration of Import Declaration in GTS. i have done configuration but GR document from feeder system shows got transfered but i m not able to view it in GTS, and no log also exist for the same"
Can you tell me what you have done so for in Configuration before I answer correctly .
It could be possible that some condition are missing .
Thanks
Mahesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Mahesh,
I did following Configuration :
1. Activated MM0A for PO Doc type feed to GTS
2. Activated MM0B for IB delivery doc type feed to GTS
3.Activated MM0C for GR doc type feed to GTS
4.Did document structure configuration in GTS for Custom
Management
4.Did Transit procedure configuration in GTS fo rthe landing of
IB delivery.
5. Did Custom processing services configuration.
could you please let me what else i need to check for the configuration so that i can my GR document in worklist for decalaration
kind Regards,
Sameer
Hi,
I have done the intrastate declaraction in GTS. I have prepared complete configuration document. If you are still looking for it please let me know.
Regards
Sudhakar Polu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please check your System Connection to SAP GTS
in the TCODE /n/SAPSLL/MENU_LEGAL
Check again, all these
Define logical system
Assign Logical System
Maintain RFC Destinations for RFC Calls
Maintain RFC Destinations for Method Calls
Maintain ALE Distribution Model
Thanks
Prarit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.