Hi,

we have external processing scenario for one of the operation in production order. Client has to send the semi finished material ( out put of first operation which produced in house, but not having any material as this is still work in progress) as material text in purchase requisition with material number blank. Since we do not have any material assigned to production order external processing operation, hence component is blank in PR, due to this system not allowing to convert PR to Purchase order. Please suggest how to proceed.

BR,
Sam.

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Dhandapani Satheeshkumar Apr 15 at 03:33 AM
0

There are 2 Options to manage this.

Option 1:

1. By Using Work In progress Batches. But this as i know will work in MTS Scenario.

Option 2:

2.1 -Create a Non-Valuated material

2.2 Attach it in the BOM as below ( Read like BOM Structure)

20 - L - NonVal01 - 10 Each - (Negative) - Attach this in operation 10 ( IN routing comp allocation)

30- L - Nonval01 - 10 Each ( Positive) - Attach to Operation 20

2.3. Now when you confirm Operation 10- Material Nonval01 will be getting produced.

2.4 Now when you make the operation sub con, the system will pick the component.

and from here you will be abl to proceed.

Option3:

3.1 Create stock ( non valuated mat stock) and attach manually in the Puchase order.

Br,

Dsk