Skip to Content
0

Run DMO from target system

Mar 23 at 03:55 PM

19

avatar image

Hi,

i want to run DMO directly on the target Hana system.

i will build hana database in target system.

Install the PAS on the target system

and then run DMO in the target system to migrate source from oracle to hana

is this possible?

do i have to install ascs also before running dmo.

i dont want to use system move option.

Please advise.

Thanks

Ren

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers