Skip to Content
avatar image
Former Member

Run DMO from target system

Hi,

i want to run DMO directly on the target Hana system.

i will build hana database in target system.

Install the PAS on the target system

and then run DMO in the target system to migrate source from oracle to hana

is this possible?

do i have to install ascs also before running dmo.

i dont want to use system move option.

Please advise.

Thanks

Ren

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers