Hi All,

I'm trying to build a copy operator, which shifts my historical values of "Actuals Qty" by one week. Their is no business meaning behind this operator, I just want to have "Actuals Qty" always filled with values up to the current week (for our demo system). I tried different ways of copying (with and without "Help KF"), but it always came up with the same result. For most weeks, the copy operator works fine. But in between I always get values which are abowe or below the actual value. (actuals-shift.png)

This is the operator I'm using: actuals-shift-operator.png

Is there something I overlooked?

I'm using the RDS content on a 1802 release.

Thanks in advance

Bastian

Accepted Solutions (1)

Accepted Solutions (1)

former_member242371
Contributor
0 Kudos

Hello Bastian,

Can you check the results at technical weeks and see if it matches?

The screenshot is shown at calendar week and it seem value are split between two buckets.

Thanks,
Rohit

former_member310060
Participant
0 Kudos

Thank you Rohit, that's excatcly what I overlooked.

All the best
Bastian