Skip to Content
0
Former Member
Aug 22, 2008 at 02:59 PM

Integration scenario with 3 Swimlanes..

19 Views

Hi ,

We have a requirement where in IDOC will be send to PI 7.0 from SAP ECC. Once the IDOC reaches PI 7.0, it has to parse the data and send some key information back to ECC. Using this key ECC will send the data back to PI using this Key (& some other fields) to PI and than PI will send to Third party system

It is like SAP IDOC -> PI -> SAP -> PI -> Third party

We are using Standard content from the vendor. For this In integration scenario there are 3 block ( swim lanes) .

First is SAP. Second in PI & third is the 3rd party system. We have assigned the 2 Business systems to SAP & 3rd party.

My Q what to assign to PI block. Shall I assign the Integration Server to this PI Block?

I checked the blogs and most of them have 2 swim lanes am looking for something on 3 lanes (SAP, PI & 3rd party). Pls note that there is no BPM here.

Please advice

Regards