Hi,

Inspection characteristics are assigned to an operation in a inspection plan (QP01/QP02)

IN characterestics overview for a given operation,

1. For few characterestics ONLY "short text insp.char" is seen with specification values(upper limit or lower limit etc), and no values in master inspection characteristic andplant field.

2. For few characterestics, the field master inspn.characterestics, plant, verstion etc all are entered. I am clear with this kind of assingment of inspn characteristics to an operatin/task.

Could you please clarify how the assignment as per point number 1 can be done?

Thanks and regards,

Nataraj

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Mar 18, 2009 at 03:30 PM

    NIL

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.