cancel
Showing results for 
Search instead for 
Did you mean: 

Price determination in case of Project sales

Former Member
0 Kudos

Hi All,

I am creating a Project and creating a quotation through transaction DP82 using document type AP in

which I have assigned item category AGN.

In quotation my assigned pricing procedure gets reflected in the quotation condition screen.

But when I am creating delivery with CNS0 and doing billing with reference to delivery I find that my pricing

getting determined directly in the billing document and neglecting the quotation. I have also tried to create

the billing document through the reference of quotation by maintaining the relevant copy control of Sales to

Billing document. But I am creating with reference to quotation then I am getting message u201CItem is not

relevant for billingu201D.

I want my pricing should determine from quotation

I have done the following things

1 Created ZAP doc. From AP u2013 (Project quotation)

2. Assigned item category ZAGN ,which has been copied from AGN

3.Item category determination (Assigned ZAGN to ZAP)

4. Maintained copy control from sales doc to billing doc (i.e. ZAP to F2)

5.I have also assigned pricing procedure key u201Cpu201D to the billing document.

Basically this issue is related to SD-PS integration from projects (WBS) to billing document.

Regards

Rahul

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check Pricing update at item level, in copying control.

In case this is set at B, make sure you set it at G. This will allow you to copy pricing from preceding document (quotation or order, etc.)

So, goto copying control, choose your respective doc. types, and at item level, check the pricing box for settings.

Cheers.

Answers (1)

Answers (1)

claudia_neudeck
Active Contributor
0 Kudos

no action since over two months, I close this thread