Hi,
Is it possible in standard to copy planned deadlines (e.g. Loading start) from shipment document to assigned deliveries (e.g. Loading date)?
Andrzej
It is not possible in standard. We have developed enhancement.
Andrzej
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
NOrmally it works the other way around. The dates from the delivery will be copied into the shipment. Can you explain why you want it the other way around? Is it for cases where you manually change the date in the shipment for whatever reason and you want that to be updated in the delivery?
MdZ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Can you expalain how normally system copy dates from delivery to shipment?
You can have 10 deliveries with different planned loading time and assigned to one shipment document.
In my scenario I need to copy planed loading date to loading date in delivery to control it i.e. in delivery monitor.
Andrzej
Hi,
It takes the dates from the earliest delivery. So let's say you have 3 deliveries with delivery dates:
del 1: 10.08.2008
del 2: 15.08.2008
del 3: 20.08.2008
Then if you have set the copy routine in customizing for the shipment type on 12 (also takes dates into account), the planned dates in the shipment will be taken from the earliest delivery:
Check-in will be set on 10.08.2008
Loading start will be set on 10.08.2008
All other statuses will be set on latest date, i.e.20.08.2008
The planned dates column will only be filled after you've set the planning button.
Regards,
MdZ