BOM

What is the t-code for "create bill of material"?

We have main materials,sub material for main material & sub material for sub material. (ie, M1, S1, SS1)

Is it possible to create BOM at 2 levels?

Awaiting for your response.

Thanks in advance

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Aug 12, 2008 at 10:18 AM

    Hi,

    CS01 - Create BOM

    CS02 - Change BOM

    CS03 - Display BOM

    First Create BOM for material S1 and component as SS1

    Now create BOM for M1 and component as S1

    Now go to CS11 - Explode BOM : Level by Level

    Here enter material as M1, Plant, Alternative BOM as "01" and BOM Application as "PP01" and execute

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 12, 2008 at 10:18 AM

    CS01 Material BOM

    Yes create assembly first and then assign BOM to assembly.

    Assembly to equipment ....

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.