cancel
Showing results for 
Search instead for 
Did you mean: 

Logistics Information System - Transaction MCSZ - Infostructure S032

Former Member
0 Kudos

Hello,

I have the following problem: The material group (table mara-matkl) are updated in the LIS (Logistics Information System) with each stock movement. We have materials with those the material group changed. But to these materials it will not give no more stock movements, thus also no update in the LIS.

So that however the material group evaluations are correct, i would like to change only the field material group in the infostructure S032. (with the current data from the table MARA) I use to it the transaction MCSZ and the method "automatic data enhancement". Unfortunately the function for this infostructure is reduced.

How can I solve the problem? Did that make already times someone? Is there another way to update around the data? I would like to actually make no complete reconstruction of the infostructure.

Regards

Jana Vogl

Accepted Solutions (1)

Accepted Solutions (1)

JL23
Active Contributor
0 Kudos

please read the instruction in OSS note 185756 - Quick correction of S032

Former Member
0 Kudos

The OSS Note was the solution! Thank you

Now I have still another subsequent problem. There are materials in the stock of material is already deleted. However in the LIS the materials exist still. How can one delete these? The data to these materials are not definitely no more needed!

Regards

J. Vogl

JL23
Active Contributor
0 Kudos

S032 is an infostructure that captures business events.

The event will not be gone if you just mark the material for deletion.

Imagine:

material mater = Elvis

event = Jail house rock

Even Elvis died, you can still listen to Jail house rock.

Even you archive the material, the data will still be visible for analysis in the info structures.

but you can archive data in info structures

Answers (0)