Hi,

I need to maintain different resource utilization for first 7 days for resource. Say 60% for first seven days and then 90%. I am able to do this by changing it in Capacity Profile, but it takes standard value in dates and there is no provision of putting a standard "+ 7 days".

Problem is the number of resources is large and it is not possible to change the capacity profile everyday. Is there a way of doing this automatically. I was not able to do it in mass maintenance.

Also I need to able to put this in a Batch Job.

Please Help.. Its kind of a show stopper for me right now.

Regards

Manoj

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 11, 2008 at 09:51 PM

    I have not been able to find a way.

    You will probably have to do custom/abap code.

    Ken Snyder

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.