Skip to Content
author's profile photo Former Member
Former Member

Transfer materials from production to warehouse

Hi experts,

Production department have received material from warehouse by transfer order and produced the material ,After that finished material need to transfer to warehouse for that what is the order we use?

thanks.

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    Posted on Aug 11, 2008 at 01:01 PM

    Hi,

    Use movement type,

    101--Goods receipt for purchase/production order into warehouse/stores

    102 -- Goods receipt for purchase/ production order into warehouse - reversal

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 11, 2008 at 02:44 PM

    Hi Kumar,

    While Production order confirmation if u set auto good movement than material transfer to given warhouse in order by movement type 101. for auto good movement u need to set pp04/pp05 control key at last operation.

    OR

    u confirm the Production order than tranfer the goods by t-code MB31 through movment type 101 from production site to warehouse.

    hope u clear,

    Regards

    jaiswin.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 11, 2008 at 07:23 PM

    Hi

    Whether it is production/process order the movement type against the order is 101 to send the Produced/procured material to WM.

    Thanks

    Saravana

    Reward if useful

    Edited by: K Saravana Kumar on Aug 12, 2008 12:54 AM

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      you need to make the receving storage location for PRD as WM managed.

      it will automaticlly create a transfer order after your confirmation.

      after confimration , it will got to cogi and from there you can do your transfer order work.

      i hope these are standar thigns.

      you dont have to worry much.

      setting for that, spro>Enterprise Structure>Logistics Execution-->Assign warehouse number to plant/storage location

      once the storage location is WM manged, all movement need to go through WM process, ie transfer order and all.

      Regards,

      Pravin Mukkawar

  • Posted on Aug 12, 2008 at 12:19 AM

    Hi,

    Via confirmation against PrdOrd you will get your FG (CO11N, CO15). This means goods movement via IM-mvt 101.

    You can set in customizing (SPRO > LE > WM > Interfaces > IM > Define Movement Types - here choose LM-WM interface) that as a consequence of goods movement with IM-mvt 101-F ('F' is movement indicator for PrdOrd) a TR (transfer requirement) should be created > you can process this TR from LB10. Processing this TR means you create a TO and goods movement in WH will be realized.

    BR

    Csaba

    Edited by: Csaba Szommer on Aug 12, 2008 2:20 AM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.