Skip to Content
author's profile photo Former Member
Former Member

Make to order

Hi Experts,

I have make to order scenario. i have created sales order. using this sales order i have cerated order BOM and routing. It has two levels of BOM. Now when i did the MRP run using MD50. it is showing only the final item and not the child item in MD04.

What might be possible cause for this

Regards

Samarth

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 12, 2008 at 07:12 AM

    Hi rao

    If the message is 52 No BOM selected. There may be few reason.

    1) in Plan order it self you can see BOM is selected or not

    2) Validity of the BOM date. If should valid on MRP explosion date.

    3) Check have assigned any MRP group in material master. Some times this will misbehave MRP run.

    3) See have assigned any fixed explosion date.

    4) Is there any alternate BOM assgined for the same header material.

    5) Check in MRP 4 Dependent requirement allowed not not.

    6) Check the MRP type is ND.

    7) Any phantom assembly is assigned for header material.

    Please check and come back.

    Regards

    J . Saravan

    Edited by: J. Saravanan on Aug 12, 2008 9:12 AM

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 11, 2008 at 11:24 AM

    Hi Samarth,

    MD50 plan at sales order level only, it will not plan the dependent requirement for that you need to run MRP again in MD02 or MD41. After that you will child item in MD04.

    Hope this will solve your problem.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      Please check planning file entry in MD21? MRP type and also check MRP dependent requirement indicator in MRP4 view of material master.

      what is Validity start date of BOM?

      Is your BOM usage is relevent for production ?

      BOM status is active? Check the setting in OS21,22,23?

      Please run MRP again in MD41 and come back?

      Regards,

      R.Brahmankar

      Edited by: R Brahmankar on Aug 11, 2008 5:43 PM

  • author's profile photo Former Member
    Former Member
    Posted on Aug 11, 2008 at 02:31 PM

    Hi Samarth,

    run MRP by MD02/Md50 than check....Md04 and than Put dependent material in header level in MD04 and check whether

    that material is planned or not. run MRP by MD02.

    Regards

    jaiswin.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      check the bom usage , validity dates, Lot size , see what selection method you have used in material master MRP 4. See what BOM & routing selection ID's you have maintained in the plant parameters. See in plant parameters in BOM explosion whether SO/WBS BOM indicator is set. If you have maintained MRP group , see the settings in OPPR.

  • author's profile photo Former Member
    Former Member
    Posted on Aug 12, 2008 at 10:41 AM

    Hi samrth rao,

    Just see the change by changing the selection method in MRP4.

    While running MRP give PLanning mode reexplode BOM and routing.

    Thanks

    Asini

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.