Skip to Content
author's profile photo Former Member
Former Member

Cost Center field in ME55 Collective Release for Purch Req

Hi all,

In ME55 (Collective Release for PReq) Cost Center is available as one of the "Selection fields", but it's (Cost Center field) NOT available in Change Layout Function (after you execute the report).

The requirement is the user want to see the Cost Center field in the ME55 report layout instead of having to drill down to each PR to see the Cost Center assigned to the PR Account Assignment.

Since Cost Center field in NOT available in the Change Layout function of ME55, How do I add it to the layout? Do I need enhancement? If so what do i need to do?

Thanks in advance

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 11, 2008 at 12:36 PM

    Hi

    Go to - SPRO - MM - Purchasing - PR - Define Screen Layout at Document Level

    Here chk the T Codes listing over thr.. Weather that ME55 is thr r not. If not thr pls add ME55 by new entry

    Then select ME55 goto details in this..Basic data, Item screen u can select the Acct Assign Catgy as Req entry or optional or display..

    Regards

    Ram

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.