cancel
Showing results for 
Search instead for 
Did you mean: 

Cost Center field in ME55 Collective Release for Purch Req

Former Member
0 Kudos

Hi all,

In ME55 (Collective Release for PReq) Cost Center is available as one of the "Selection fields", but it's (Cost Center field) NOT available in Change Layout Function (after you execute the report).

The requirement is the user want to see the Cost Center field in the ME55 report layout instead of having to drill down to each PR to see the Cost Center assigned to the PR Account Assignment.

Since Cost Center field in NOT available in the Change Layout function of ME55, How do I add it to the layout? Do I need enhancement? If so what do i need to do?

Thanks in advance

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Go to - SPRO - MM - Purchasing - PR - Define Screen Layout at Document Level

Here chk the T Codes listing over thr.. Weather that ME55 is thr r not. If not thr pls add ME55 by new entry

Then select ME55 goto details in this..Basic data, Item screen u can select the Acct Assign Catgy as Req entry or optional or display..

Regards

Ram

Former Member
0 Kudos

Hi Rama,

ME55 is PR release (collectively). What you specified is Field Sel Key configs. Field Selection is nothing do with ME55 Report layout

Thanks for your reply anyway.

Answers (0)