on 08-08-2008 1:01 PM
dear all,
by any chance can i change the batch number once material doc is posted and material is already there in stock with X batch number.
i dont want to cancel the material document.
please advice..
regards,
Hi,
Create the new batch first through MSC1N for material, plant & sloc combination.
Then you can transfer the stock from existing X Batch to new Y Batch through 309 or 311 movement type.
Enter the receiving batch as the new Y batch. & the existing batch as X.
Edited by: Komal Gala on Aug 8, 2008 4:09 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
First create batch manually for material, plant and sto. loc. combination in MSC1N
Do Transfer Posting of Material from 1 batch to another.
Do 311 - Transfer Posting S loc to S loc in MB1B
Enter receiving batch as different batch
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
9 | |
8 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.