MF60 (Material staging) - Display different requirement dates in pull list

Hi

I've got the following problem.

If I choose a couple of process orders, the pull list of the material staging, summarize the quantitys and shows only just one requirement date. Instead I need the different orders and the different requirement dates to be shown for the consumption of components in the pull list.

Anybody know how to configure the pull list to show this scenario?

Thanks a lot.

Francisco O.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 10, 2008 at 05:33 AM

    Hi,

    When you make a pull list , the system will create reservations

    for the components that comes from all the open orders collectively.

    The reqmts date will be the earliest one.

    Now you have to click the Blue lens in which the system will

    show the reqmts of components arising from various orders separately and each orders reqmts date will be shown individually.

    Regards,

    nandha

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 08, 2008 at 04:05 AM

    Hi,

    Please check with settings at Global settings in initial screen of the Pull list.

    Pradeep

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 08, 2008 at 04:17 AM

    Hi,

    Go to MF60 Click on global setting (F5) tick mark including all requirement click all display item.

    Please check and come back.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 08, 2008 at 03:57 PM

    I have tried but the different dates of the components of the orders are still not displayed.

    I think this can't be done in standard.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 13, 2008 at 03:34 PM

    I checked and i found a user exit to show the requierements need date in detail by component.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.