While taking MRP run,the requirement were generated without considering the stock at Sub-contractor.

As we send the same material for machining operation at 2-3 sub contracors.

We take MRP run through the MD01(as scope of planning setting are here)

All 3 plants were take under the planning scope( X ).

No MRP area defined separetly.

Make to stock scenario here.

What customisation setting we will required to consider the subjected matter.

Please guide,& reply soon.

Regards,

Chandra.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Aug 07, 2008 at 01:09 PM

    Dear Chandra,

    Special stocks are not considered for MRP run. Subcontracting stock is a special stock(O), hence is not considered for MRP.

    Hope clear to you.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 07, 2008 at 12:47 PM

    Hi,

    You can have a separate dummy plant as subcontractor where the stocks will be stored ( that will be as Subcontractor stock).

    U can include that plant in ur MRP RUN.

    Regards,

    Prakash

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.