Dear All

We have a scenario as below.

Currently our batch definition is at client level. Batch number is unique across the client.

Whenever a batch is created we carry out inspection and this is updated in the batch by linking MIC & Batch characteristic.

Quite often we transfer a part of this batch to another location i.e. letz say from US to Europe.However European test standards are different from US. This means whatever results that got updated in batch when it was created in US is not valid in Europe.

So we create a new batch, create new inspection lot, carry out testing as per European standards and then update the batch with new results.

Is there any better way of handling this. We would like to avoid creating a new batch.

Thanks & Regards

TOM

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Aug 10, 2008 at 01:29 PM

    Hi Pintoo,

    According to your question, I understand that your Client is having stock transfer scenario.

    So He is having different plants at different locations within one company code..

    He wants to transfer material from one plant with one batch no. to another plant within the company code.

    If te situation is this,

    you just activate Quality -view in Material Master with for material receipt from purchase

    After carrying all the STO scenario, Material receipt will takes place through MIGO, at that time you assign the batch no., what ever you required, and receipt the material

    Automatically Inspection Lot will generated.

    For that you do UD.

    Your batch no. will be remain same.

    One more option is that,

    After receiving the material in to your location with different batch no. you can assign your required batch no. by STO.

    Within the plant location to location or Location to same location, through MB1B. There you can change the batch no.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hello TOM,

      See if you want to deactivate the Batch creation at material material stock transfer then follow the SPRO path such as,

      SAP Customizing Implementation Guide->Logistics - General->Batch Management->Creation of New Batches->Define Batch Creation for Goods Movements.. and select the option "NO Creation", for movement type 309.

      There are some other options also available here such as Check against user exit, so you can define some user exit for stock transfer posting. Sit with your ABAPer and MM guy.

      Regards,

      Shyamal

  • author's profile photo Former Member
    Former Member
    Posted on Aug 12, 2008 at 12:14 PM

    Dear Pintoo,

    You can try inspection with Multiple specification option.Please go through the link below.

    http://help.sap.com/erp2005_ehp_03/helpdata/EN/0b/a82442f53cde2ce10000000a1550b0/frameset.htm

    Regards,

    Ram

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.