Former Member
Aug 06, 2008 at 02:46 PM

Forecast Release to R/3 fails: Component xxx in location yyy not planned

354 Views

Hi,

I would be grateful if you would contribute if you have experienced this problem in the past. I am releasing to R/3 and end up with the above statement in the spool with no errors in the CIF queue.

I have satisfied all pre-requisites for ensuring correct release to R/3 (shown below). I have also checked in R/3 to ensure that the material xxx can be planned in the location yyy and is relevant for APO planning (the entry in APOKZ in MARC is set to 3). However, I still come up against this error.

I shall look forward to hearing what you believe the issue could be.

Thanks,

Eric ADU

1. Set up the connection between SAP APO and SAP R/3.

2. Maintain distribution definition for planned independent requirements distribution in SAP SCM ).

3. Check the business transaction event (BTE) application indicator for ND-APO in SAP AFS.

4. Make the settings in Customizing by going to Integration with Other SAP Components, and choosing Advanced Planning and Optimization -> Basic Settings for the Data Transfer -> Change Transfer -> Change Transfer for Transaction Data -> Activate Online Transfer Using BTE.

5. Maintain planning strategy group as 40 for the material.