on 08-05-2008 11:50 AM
Hi
I would like to know the full procedure for automatic reorder point.I would like to know the tcodes alond with the procedure.
Thanks in advance
Subhash
Points will be awarded
hi
Reorder Point Planning : briefly - typically there are many more things to consider and set but this may get you started:
Material Master data: MRP1 view
Assign a reorder type MRP type, i.e. VB, V1 (there are a few standard ones). Lot size = HB. Specify a reorder point and maximum stock level.
If you create a new MRP type you can set forecasting for optional or mandatory in the IMG.
Historical consumption values can be entered in the consumption tab in material master - additional data or branch from forecasting tab.
check this
http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d256344af11d182b40000e829fbfe/frameset.htm
http://www.sap123.com/showthread.php?t=89
for manual reordering point
and
http://www.sapfans.com/forums/viewtopic.php?t=263729
for automatic
regards
kunal
Edited by: kunal ingale on Aug 5, 2008 1:00 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1. MM02 - MRP 1 view, here enter MRP Type - VM, Lot Size - EX and then enter Quantity for Reorder Point generation and in Consumption tab add / put all consumption historical values...
2. MD02 - MRP Run for Material with following Parameters
Material
Plant
Processing key NETCH Net change for total horizon
Create purchase req. 1 Purchase requisitions
Delivery schedules 3 Schedule lines
Create MRP list 1 MRP list
Planning mode 3 Delete and recreate planning data
Scheduling 1 Basic dates will be determined for plann
Activate all "Process Control Parameters"
And then Press Enter.
System will give Planned Order/Purchase Req. if Stock of Material falls below the Reorder Point.
Also put some stock for the material so that you can analyze it in better way.
3. MD04 - Stock Requirement Analysis
Note: -
For Lot Size FX, you need to maintain "Fixed lot size" also in MRP 1 view.
And the calculation will happen as following;
Fixed lot size = 500 EA
Reorder Point = 1000 EA
Available Stock = 700 EA
Now as per calculation requirement is of 300 EA (Reorder Point - Available Stock = 1000 - 700 = 300 EA)
But Planned Order or PR will be generated of 500 EA since Fixed lot size = 500 EA.
But in case of Lot Size "EX", system will generate a Planned Order or PR of 300 EA only.
And Use Transaction Code MDBT for Planning in Background
Go to MM02 - > ChangeMode of your material for which you wanna maintain the MRP -> In MRP tabs -> Fill the data like Reorder point, safety stock, in Consumption tab add / put all consumption historical values...
THIS IS THE BIGGEST PREREQUISITE FOR THE SAME..
From other tcodes you can display the reqirements as usual..
Regards,
Priyanka.P
AWARD IF HELPFULL
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.