Skip to Content
author's profile photo Former Member
Former Member

Error During Material replication

Hi Experts,

We are facing a peculiar problem. I have set up material replication from ECC 6.0 to SRM 5.0. All required table entries have been manitained in ECC and SRM. The required sites have been created in SRM.

When I load DNL_CUST_BASIS3, the ojbects are halted in the outbound queue of the ECC system.

SYSFAIL : Time limit exceeded.

Have you ever faced a similar issue. Please do let us know as we have no clue why this is happening.

Thanks and best regards,

Jith

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 05, 2008 at 06:41 AM

    Hi,

    Please very the steps once again as described in this blog :

    How to replicate material master from R/3 to SRM

    Select the queue and activate again.

    Best regards,

    Sridhar.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.