on 08-05-2008 5:24 AM
Hi friends,
i want how to configure the material master.plz urgent.plz provide how to start this configuration .plz provide necessary steps. plzz urgent.
Thanks
venkat
Very helpful link for you,
http://sap-img.com/materials/sap-mm-configuration-tips.htm
http://sap-img.com/sap-mm.htm,
1) Logistics General : Material Master
regards,
Chintan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
MM01
GIVE material no,industry type,material type
Then give plant and storage location
Select Basic data 1,2,purchasing,sales views,mrp views,accounting views,costing views.
In all these views maintain all mandatory fields
Again if u have any doubts plse ask
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can define that a particular industry sector is proposed whenever the user creates a material master record.
Goto your user profile, own data (tranx SU3), click on Parameters tab, place MTP under parameter and your desired industry code, say M (for Mech/engr) in values and save. You should see your default in mm01.
For complete configuration of material master follow the path,
Goto SPROLogistics - GeneralMaterial Master--Configuring the Material Master, where you will get Quick Guide Using an Example. Go through it and start configuration.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.