Hi all,

Our requirement is that, We have two plants and in two plants also the old material number is different on each plant.

Now, how can we upload the old material number for two plants. client requiremnt is that they want to use the old material number for some time before they can be comportable with new SAP internal number system.

Solution please.

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 04, 2008 at 10:16 AM

    Extend old material number to required plant...

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 04, 2008 at 10:32 AM

    hi

    you need to do this with BDC or LSMW

    as far as i know there is no std functional module to change it but suerly u can do it with BDC

    THIS IS POSSIBLE ONLY IF YOUR CLIENT IS MAINTAINING MATERIAL MASTER AT PLANT LEVEL

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.