Skip to Content
author's profile photo Former Member
Former Member

PI 7.0 - pb with transport of several ID scenarios

Hi,

we are in PI 7.0 - SP14 and when we want to transport together two scenarios of ID (from DEV to QUA) we have a problem of conflict during the activation of the change list, because the Business System is defined in each scenario.

We want to be able to transport several scenario (several ".tpz" transport files) in a same time , like a package corresponding to a business area (e.g HR data, Store data, etc...), and not only one by one (too many actions...).

Is there a mean to solve this issue with the BS ? by using CMS, CTS+, OTO ? SP higher than SP14 ?

Regards

Mickael

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 04, 2008 at 09:52 AM

    HI,

    You can go for CMS or CTS+

    Conflict Resolution u2013 How to Analyze, Handle, and Avoid Integration Conflicts

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/f0bb614d-2848-2a10-52a7-b5000043b475

    Thanks

    Swarup

    Edited by: Swarup Sawant on Aug 4, 2008 11:53 AM

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 04, 2008 at 10:04 AM
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.