Hi Experts,

I have a problem in Rescheduling date proposal by the system.

For a raw material, it will take 21 days planned delivery time.

i need the raw material on 11.08.2008. i am running the MRP today.

In the planning result, the system gives Dep reqmt date is 11.08.2008 and the Pur. Req. date also same 11.08.2008.

It is giving the exception message 03 (New, and start date in the past).

But in the rescheduling field, there is no date displayed.

My actual requirement is the system should consider from todays date, and it should propose the date on which i can receive the raw material.

Please advice me what settings should i do?

Thanks & Regards

Bala

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Aug 04, 2008 at 09:46 AM

    Hi,

    Please check your previous thread I have explain there with example also. Then come back.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.