Skip to Content
0
Former Member
Aug 04, 2008 at 05:48 AM

Subcontracting

11 Views

Hi,

Can i have the control over the material stock with the vendor with its value?

For instance, when i'm sending the material to the vendor for subcontract, i need to limit the material with the vendor(by its value) for Rs1 lakh (including material already with the vendor + material being sent ).