for 1 material document - many inspection lots?

Dear All,

Is it possible to have more than 1 inspection lot for 1 material document posting from MFBF.

Ex suppose from MFBF if confirm 10 qty is there any possibility to have 10 inspection lots for the same material doc.

Regards,

Anil

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • avatar image
    Former Member
    Aug 01, 2008 at 10:19 AM

    hi

    i think there is no option,

    but you can get when you do partial GRNs.

    one lot for one material document -item

    -ashok

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 01, 2008 at 10:21 AM

    Hi Anil,

    This is possible if you have 10 Line items in material document.

    You can do this by going into Mater Master -> QM view -> Insp. Setup.

    Select desired Inspection Type. Change Control insLot to -> For each material document item.

    There is no way if you have 1 Line item in material document with 10 quantity.

    Reward points if helpful.

    Regards,

    Arpit

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Dear All,

      I've mentioned that from MFBF which isbackflushes the qty from planned order in PP. not MM GRN Document.

      Regards,

      Anil

  • avatar image
    Former Member
    Aug 06, 2008 at 04:56 PM

    Hi Anil,

    I am interested in knowing the business case behind this. Also, are you using RF transactions to scan off palltets / units as they come out of the line ?

    Cheers

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Shyamal,

      Thanks for the reply.

      I have already activated the MM with the relevant inspection type.but client doesn't want to backflush the qty for every time. practically for 1 vehicle there are around 600 subassemblies in the BOM. in such case system takes more time. in such a case it is not feasible to confirm the qty one by one each time.

      by the way i have raised the OSS for the same and lets see what SAP suggest.

      Regards,

      Anil

  • avatar image
    Former Member
    Jul 20, 2009 at 07:21 AM

    closed.