Skip to Content
0
Former Member
Aug 01, 2008 at 09:01 AM

Plan with Usage 5 and Status 3 not getting assigned to lot of type 01

18 Views

Hi Everybody,

For a particular material the Inspection Plan header has Usage 5 and Status 3. When a inspection lot is created with inspection type 01, this plan is not getting assigned to the lot. When I change the Status of the plan from 3 to 4, the plan gets assigned to the lot easily.

Can you please tell me why this is happening ?

Regards,

Manish.