Skip to Content
0
Former Member
Aug 01, 2008 at 02:15 AM

Split Production from the DC Plant

33 Views

Hello Gurus

Can one please guide me the following business requirement.

We have two manufacture plants A & B and C will be our DC Plants .

from DC distribution( C) we need to split the requirement for two manufacturing plants( A & B ).

What are the settings we need to do in the material master to create a STO from the DC distribution( C) plant .

The demand management will be maintained in the DC Plant only through SOP .

Thanks for the help

Thanks

JJ