Skip to Content
0
Former Member
Jul 30, 2008 at 07:29 AM

Is there option to assign Production Version in MD62

118 Views

Hi,

Can any one please help.

I have a HALB Material with 3 Production Versions (with the same Lot Size and Validity Dates)

While creating Planned Indipenmdent requirement (PIR). how can i specify what Production version to be used here and as well for MRP run.

Can any one please guide me.

Thanks and Regards

Khadeer