Hi Experts,

Currently my client is using SAP Netweaver PI 7.1 dual stack. Only in a single interface he is using ccBPM functionality. He wants to upgrade his system to SAP PI 7.5 using the same licences .

We can use dual stack split procedure for this but for this we need to install AS ABAP and JAVA separately. My query is: -

1) If i redesign the ccBPM interface replacing ccBPM functionality with some other logic would i still require to install AS ABAP as a part of dual stack split procedure?. As all my interfaces can be designed in java stack.

2)Which SAP Netweaver version does i require for SAP PI 7.5?

Regards,

Rajesh Ginka

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    Mar 05, 2018 at 07:53 PM

    Hi Rajesh,

    Thank you for contacting us!

    Questions:

    1) For ccBPM you need the ABAP because of UME and for more things..and is not possible to slip them. Does not have any possibility to split a dual stack in a single stack.

    2) SAP Netweaver 7.50 SP 09 and above.

    Kind regards,

    Gabriel Cassel

    SAP Product Support

    Add comment
    10|10000 characters needed characters exceeded

    • Hello Gabriel Cassel

      I have similar question as Rajesh Ginka regarding our PI 7.1 dual-stack upgrade procedure.

      If we decide to install a fresh installation PI 7.5 dual-usage SP13+ then migrate the interfaces (with migrate tool PI java) and exprot/import the ccBPM to ABAP system.

      The new PI 7.5 system will be with same SAP licences (volume based)?

      Thanks

      Aviv Cohen.