Skip to Content

Determining storage location in a MM scheduling agreement from MRP area

Hi,

how to set default storage location in a MM scheduling agreement from an MRP area defined in material master MRP 1 view.

The already set storage location for external procurement in the material mater should be bypassed and should not be used for setting storage location when scheduling agreement is created.

guru.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Mar 04 at 08:19 AM

    Can't you overwrite in the scheduling agreement whatever is proposed from material master?

    Why do you maintain this field in the material master if it shall not be used?

    Add comment
    10|10000 characters needed characters exceeded

  • Mar 05 at 10:50 AM

    i have a scenario where planning need to be done both at plant level and also MRP area level.

    At plant level I get the same material through stock transport route using F/40. In MRP area I plan to get the same material from an external supplier.

    I have an external non sap system which triggers creation of the agreement. The ME31L is called however in background.

    so during this time even though I have a different storage location in my mrp area, this is not set in the agreement.

    so I wanted to know how to get this storage location automatically onto my agreement. so that user need not have to manually change the location .

    Add comment
    10|10000 characters needed characters exceeded

    • Not really sure what you expect from us if you create the schedule agreement programmatically. Then it is just up to your coding.