Skip to Content
author's profile photo Former Member
Former Member

Overtime on Public Holiday

I have configured the system for generating Overtime wagetype which gets pickup based on Overtime Processing Type 'M'.Now but if the employee works on Public Holiday,it is not genrating Over time wage type,after checking log,it shows Processing Type - 'S'.But i want to consider the Public Holiday class in Over time Period.

How can i do that.Please help me in this.

Thnx,

Deepak Ku.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 31, 2008 at 05:58 AM

    hai deepak,

    you need to define overtime rates in time transfer specification based on the nature of overtime,then system will recognise the relevant overtime type.

    Regards,

    Chiran Reddy.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 31, 2008 at 07:01 AM

    Hi,

    After Making Changes in TO01 and TO02 , goto T510S and then give the condtion saying that OVER TIME 'M' to be generated on Public Holidays and then Give the % in V_512W_B.

    Check it,

    Regards,

    Vinod.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.