Mass Maintenance of Resource in APO

Hi,

I need to make changes in a number of resource in APO at a time. Do we have a mass maintenance process in APO to do that. I need to be able to chnge the Capacity Variants.

Is there a way if i can put that in a batch job in the background.

Reply awaited.. thanks in advance.

Regards,

Manoj

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jul 25, 2008 at 02:00 AM

    use MASSD for maintining resources

    use MASSBACK for doing background maintainance

    edit: oops looks like i double posted.

    a having problems with SDN forum while posting.. is it just me or any of you have issues?

    Edited by: Harish AN on Jul 25, 2008 12:00 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 25, 2008 at 12:57 AM

    Try MASSD and see if you can pick up your resources and the fields to be changed

    if it helps you can use MASSBACK to schedule it in the background

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.