Skip to Content
author's profile photo Former Member
Former Member

Periodic Billing

Hi,

While creating contract in periodic billing with rental contract, I get an error tht " Plant XYZ is not assigned to controlling area".

How to resolve it ? And why it is asking for controlling area?

Plz suggest.

Regards,

Ankur

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jul 25, 2008 at 03:30 AM

    Hello,

    You need to create a controlling area and assign it to the company code. I don't think you can assign a controlling area drecty to a plant. As the rent is considers as cost, the controlling area is required.

    SPRO --> Controlling --> General controlling --> Controlling Area --> Define controlling area.

    There is another option to assign the controlling area to company code, make that setting too.

    Prase

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.