Skip to Content
author's profile photo Former Member
Former Member

sto

HI gurus

Please tell me Stock Transfer Order (STO) process (between two plants belogs to one company)

I have a material (1530) which is exitsting both the plants (ZDSR, ZDPR)

Please tell me how to do this process. Will reward u

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Jul 23, 2008 at 12:01 PM

    Hi,

    Refer following links;

    [Two-step movement Plant to Plant and STO|http://www.sap123.com/showthread.php?t=176]

    [Stock Transfer Process b/w Two Plants|http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/4b9036dfe4b703e10000009b38f889/frameset.htm]

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 23, 2008 at 12:02 PM

    Hi,

    1 ) raise Stock transport order in ME27 (or) ME21 N

    enter the supplying plant and the receiving plant

    enter the material and qty and save STO order no is created

    2) use T.code : MB1B

    enter the movement type : 351

    enter the supplying plant & Storage location

    enter the sto no

    enter the material no and qty and save

    3) use can see in MB5T the material is in TRANSIT

    4) please raise MIGO and inward the material in movement 101

    G.Ganesh Kumar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 23, 2008 at 12:29 PM

    Hi,

    You can either do two step stock transfer or one step stock transfer.

    Two Step:

    Create Stock Tranport Order (STO) through ME27 or ME21N.

    Enter Doc type as UB, supplying plant, receiving plant, receiving sloc, material, qty, purchasing group, & other mandatory fields & save.

    Then create Stock transfer note (STN) nothing but good issue from supplying plant through MB1B. Enter Mov Type as 351, supplying plant & sloc, STO number. Adopt details from this STO like material , qty, receiving plant & then save.

    You can check the stock in transit through MB5T.

    Then create Goods Receipt (GRN) through MB01 or MIGO. Enter the STO number & adopt details from it. Enter the required fields & save.

    One Step:

    Here, no need to create goods issue & goods receipt separately. Just create one document with mov type 301 through MB1B. Enter the mov type, supplying plant, supllying sloc, receiving plant, receiving sloc, material, qty n other details & save.

    You can choose any of these based on your requirement.

    If you want to track each & every movement while stock transfer then go for 2 step stock transfer wherein you can even track stock in transit.

    Reward if useful.

    Regards,

    Komal

    Edited by: Komal Gala on Jul 23, 2008 2:30 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 24, 2008 at 05:00 AM

    h

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.