cancel
Showing results for 
Search instead for 
Did you mean: 

sto

Former Member
0 Kudos

HI gurus

Please tell me Stock Transfer Order (STO) process (between two plants belogs to one company)

I have a material (1530) which is exitsting both the plants (ZDSR, ZDPR)

Please tell me how to do this process. Will reward u

Thanks

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

h

Former Member
0 Kudos

Hi,

You can either do two step stock transfer or one step stock transfer.

Two Step:

Create Stock Tranport Order (STO) through ME27 or ME21N.

Enter Doc type as UB, supplying plant, receiving plant, receiving sloc, material, qty, purchasing group, & other mandatory fields & save.

Then create Stock transfer note (STN) nothing but good issue from supplying plant through MB1B. Enter Mov Type as 351, supplying plant & sloc, STO number. Adopt details from this STO like material , qty, receiving plant & then save.

You can check the stock in transit through MB5T.

Then create Goods Receipt (GRN) through MB01 or MIGO. Enter the STO number & adopt details from it. Enter the required fields & save.

One Step:

Here, no need to create goods issue & goods receipt separately. Just create one document with mov type 301 through MB1B. Enter the mov type, supplying plant, supllying sloc, receiving plant, receiving sloc, material, qty n other details & save.

You can choose any of these based on your requirement.

If you want to track each & every movement while stock transfer then go for 2 step stock transfer wherein you can even track stock in transit.

Reward if useful.

Regards,

Komal

Edited by: Komal Gala on Jul 23, 2008 2:30 PM

Former Member
0 Kudos

Hi,

1 ) raise Stock transport order in ME27 (or) ME21 N

enter the supplying plant and the receiving plant

enter the material and qty and save STO order no is created

2) use T.code : MB1B

enter the movement type : 351

enter the supplying plant & Storage location

enter the sto no

enter the material no and qty and save

3) use can see in MB5T the material is in TRANSIT

4) please raise MIGO and inward the material in movement 101

G.Ganesh Kumar

pankaj_singh9
Active Contributor
0 Kudos

Hi,

Refer following links;

[Two-step movement Plant to Plant and STO|http://www.sap123.com/showthread.php?t=176]

[Stock Transfer Process b/w Two Plants|http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/4b9036dfe4b703e10000009b38f889/frameset.htm]