Skip to Content
author's profile photo Former Member
Former Member

How to MRP Setup

Dear All

I'm intending setup MRP for system,

Could you please explain me about MRP profile, MRP group, MRP controller, MRP type ?

Do you have any document about setup MRP ?

Thank and Best regards,

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 23, 2008 at 04:39 AM

    Hi

    MRP Profile -All the MRP 1,2,3,4 views in the material master data are entered in this profile and create MRP profile.

    When you are creating Material Master in MM01 while entering the plant and storage location enter your MRP profile so that you do not need to enter the MRP data again

    MRP Group: You can create the MRP Group so that material can be tracked.

    Setting --> SPRO-MM-Consumption based planning -MRP Group

    MRP controllers : Setting --> SPRO-MM-Consumption based planning -Master data -Define MRP group.

    MRP types : Setting --> SPRO-MM-Consumption based planning -Master data -Define MRP types

    G.Ganesh Kumar

    .

    Add a comment
    10|10000 characters needed characters exceeded

    • HI

      MRP groups are used when the plant division for planning is not enough for the division of the different materials MRP requirements. You assign different groups according to the requirements to run MRP (different Settings). These settings will be taken in account when you run MRP for single item or total planning.

      MRP controller is the person in charge of the MRP run for the materials. It is still a further division on your MRP. This is work load related. You can have one MRP controller for materials with different MRP groups.

      On your MRP group, you will define the parameters for the MRP run. These parameters are calculated in accordance with the settings on your material master MRP views.

      Available stock =

      Plant stock - safety stock +

      receipts of (purchasing orders + purchasing

      agreements + production orders) - required quantity.

      This means that all the requirements are calculated in the bases of your material master settings and your MRP group settings.

      MRP TYPE

      It is procedure that you set in the system on how the

      Material is planned

      Reorder Point

      Seasonal requirement

      Replenishment

      Vendor Managed

      Forecast Based

      Master production Scheduling

      REGARDS

      KUNAL

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.