Hi Group,
We have a current business scenario as follows:
There are 2 materials say A & B. Material B is made from material A by mixing water to it. Say 100 tonnes of material B is produced by mixing 80 tonnes of material A and 20 tonnes of water. Currently the process is being handled in SAP by creating a transfer posting from A to B for 80 tonnes and then the remaining weight of material B produced viz. 20 tonnes, is brought into inventory by doing a 501 movement.
Business is not happy with the process that we are valuating the material B for the 20 tonnes. Is there any way to handle this scenario in SAP? You may propose a different process too. Both the materials A & B have moving price average as price control.
Please let me know if you need further clarification. Points will be awarded.
Thanks