Skip to Content

Workflow status problem

helle experts,

I have a problem in the workflow statuses. there is a difference in the front end and the item backend status.

The front end status of one of the gate approval G4 is shown in the front end like this

The same stage in the backend in the item is canceled as shown below

as shown the g4 is canceled and the same is passed in the front end.

Is there a way to make the item as complete for the WF that is showing as Pass in the frontend.

how this could happen in the first place.

1.png (3.9 kB)
2.png (19.9 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers