Hi,
Follow the steps for customization of material master
1. Material Number:
SPRO -> Logistic - General -> Material Master -> Basic Settings -> Define Output Format of Material Number
TCODE: OMSL
2. Define Field Reference:
SPRO -> Logistic - General -> Material Master -> Field Selection -> Maintain field Selection For data Screens
T CODE: OMS9
3. Define Industry Sector:
SPRO -> Logistic - General -> Material Master -> Field Selection -> Define industry Sectors and industry -sector- specific Field Selection
T.Code:OMS3
4. Material Type:
SPRO -> Logistic - General -> Material Master -> Basic Settings -> Material Type ->Define attribute of material Type
T.Code:OMS2
(Select Material Type: ROH for ur raw material( example) copy it and renamed it to UR RAW MATERIAL)
5. Define Screen Sequence:
SPRO -> Logistic - General -> Material Master -> Configuring the Material Master -> Define structure of Data Screens for each Screen Sequence
T.Code:OMT3B
(Select Screen Sequence: 21, copy it and renamed it to Z with any letter( Like ZA or ZB )
6. Ordering Screen Sequence:
SPRO -> Logistic - General -> Material Master -> Configuring the Material Master -> Maintain Order of main and Additional Screen
T.Code:OMT3R
7. Assign Screen Sequence to Industry Sector:
SPRO -> Logistic - General -> Material Master -> Configuring the Material Master -> Assign Screen Sequences to User/Material Type/Truncation/Industry Sector
T.Code:OMT3E
8. Assign Field Reference to Plant:
SPRO -> Logistic - General ->Material Master -> Field Selection -> Define Plant -Specific Field Selection and Plant -Specific Screen Selection
T.Code:OMSA
9. Define Material Group
SPRO -> Logistic - General -> Material Master -> Setting for Key Field -> Define Material Group
T.Code:OMSF
10. Define Number Range of Material:
SPRO -> Logistic - General -> Material Master -> Basic Settings -> Material Type ->Define Number Range for each Material Type
T.Code:MMNR
11. Define Purchasing Group:
SPRO -> Material Management->Purchasing->Create Purchasing Group
T.Code:OME4
Fore more check the Link
http://www.sap123.com/showthread.php?t=27
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
u can use
OMS2 for creating and changing mat types
MMNR for assgning no ranges for mat type
OMSR for assign field selection to sel grps
OMS9 for maintain field selection for data screen
reward if helpful
regards
kunal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dear
kindly go to
SPRO-LOGISTIC GENERAL-MATERIAL MASTER
here you can configure the material master.
1) start with 'STTING FOR KEY FIELDS".. define everything there and then
2) go to "BASIC SETTINGS" and do you activity.
regards
rewa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
12 | |
10 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.